Procurement & contracting requirements
Bid forms, procurement scope and document requirements
NorthEastCOST ESTIMATING GROUPWhole-project coordination or a single trade package. Explore the active CSI divisions below and tell us exactly what belongs in your estimate.
35 divisions shown
Bid forms, procurement scope and document requirements
Project overhead, temporary facilities and coordination allowances
Demolition, surveys and existing-site scope
Foundations, slabs, formwork and reinforcing
Brick, block, stone and related assemblies
Structural steel, miscellaneous metals and railings
Framing, carpentry, sheathing and millwork
Roofing, insulation, waterproofing and cladding
Doors, frames, hardware, windows and glazing
Drywall, ceilings, flooring, paint and wall finishes
Signage, partitions, lockers and accessories
Commercial and specialized building equipment
Casework, window treatments and furniture scope
Special-purpose rooms and pre-engineered systems
Elevators, lifts and escalators
Sprinklers, piping and fire suppression systems
Fixtures, water, waste, vent and plumbing equipment
HVAC equipment, ductwork, piping and insulation
Building automation and integration scope
Power distribution, lighting, devices and feeders
Structured cabling and communications systems
Fire alarm, security, access control and monitoring
Excavation, grading, fill and soil preparation
Paving, landscaping, fencing and site finishes
Water, sanitary, storm and utility infrastructure
Transportation systems and associated scope
Marine works and waterway scope
Process piping, connections and related scope
Material handling and processing equipment
Process thermal equipment and associated scope
Process handling, treatment and storage equipment
Pollution control and waste processing systems
Specialized production and manufacturing equipment
Treatment equipment and process systems
Power generation equipment and related scope
No matching divisions. Try a different term or ask about your scope.
Division numbers are not consecutive. Reserved or unused divisions are omitted. Specialized process and infrastructure assignments are reviewed for scope and availability before acceptance.